How wet room installation works
Wet room installation usually begins with stripping out the existing space and preparing the subfloor and walls. Waterproof tanking systems are then installed to fully seal the room.
A specialist drainage system is fitted, and the floor is carefully graded to ensure water flows correctly. Once complete, tiles and fittings are installed, sealed, and tested to ensure the wet room is fully waterproof and ready for use.